Exemption from Building and Zoning Regulations
If specific building and planning regulations cannot be complied with, exemptions must be requested as part of the applicable procedures. For construction projects that would otherwise be exempt from procedural requirements, a formal application must then be filed as an “isolated exemption.”
Details
To the extent that the non-permit-required construction projects referred to in § 63 of the Thuringian Building Code (ThürBO) cannot be fully implemented in compliance with the applicable building and planning regulations, an application must be submitted in accordance with § 73 ThürBO, including a justification, for any deviations from the regulations.
Example
A garage under § 63(1)(1)(b) ThürBO that does not maintain the required distance from a public traffic area (3.00 m) as specified in § 2(1) ThürGarVO. A possible justification in this case could be:
- a rarely used side street,
- installation of a remote-controlled garage door.
If a deviation from regulations protecting neighbors is to be made, the participation of neighboring parties is also required under § 76 ThürBO.
Documents
- Request for an Exemption
- In addition to the application for an exemption and its supporting rationale, additional construction documents are typically required for review, similar to those submitted in the building permit process.
Hours of Operation
| Tag | Zeiten |
|---|---|
| Montag | 08:00 – 12:00 und 13:00 – 16:00 Uhr |
| Dienstag | 08:00 – 12:00 und 13:00 – 16:00 Uhr |
| Mittwoch | keine Sprechzeiten |
| Donnerstag | 08:00 – 12:00 und 13:00 – 18:00 Uhr |
| Freitag | 08:00 – 12:00 Uhr |
Hinweise
Um vorherige Terminvereinbarung wird gebeten.
Fees
| Services | Fee |
|---|---|
| per deviation from building code regulations, rate item 5.1 | €50.00 to €5,000.00 |
| Per exception to building planning regulations, rate item 5.2 | €35.00 to €1,000.00 |
| Per exemption from building planning law, rate item 5.1 | €50.00 to €5,000.00 |
Legal Basis
- Thuringian Building Code (ThürBO), § 73
- Thuringian Building Fees Ordinance (ThürBauGVO), Schedule Items 5.1 and 5.2
Contacts
| Name | Funktion/Bereich | Kontakt |
|---|---|---|
| Kathrin Stenzel | District 2 Team Leader District 2 Project Review Team |
E-Mail: kathrin.stenzel@jena.de Telefon: 0049 3641 49-5067 Fax: 0049 3641 49-5055 Raum: 01_43 |
| Sebastian Mortag | District 1 Team Leader District 1 Project Review Team |
E-Mail: sebastian.mortag@jena.de Telefon: 0049 3641 495090 Fax: 0049 3641 495055 Raum: 01_48 |